Latest updates

30 Jul 18

Protecting the Billiard Room

The floor, furniture and billiard table in the Billiard Room are covered with protective materials, ready for scaffolding to be installed.

The Billiard Room in Tyntesfield house protected with conservation materials

25 Jul 18

Installing cabling to the chapel

The engineers install the new fire alarm system cabling in the spiral staircase attached to Tyntesfield's chapel.

A reel of cable on a spiral staircase

03 Jul 18

Floorboards up on the first floor

Floorboards lifted in Lord Wraxall's Bedroom and Mr Gibbs' Bedroom on the first floor of Tyntesfield house. Cable will be laid underneath the floorboards for the new sensor in the Organ Room on the ground floor.

Floorboards lifted in two rooms at Tyntesfield